Hawaiian dredging waterfront10/18/2023 “As part of the Navy’s Shipyard Infrastructure Optimization Program, replacing Dry Dock 3 at Pearl Harbor Naval Shipyard is a critical enabler of increased naval capability,” US Navy Industrial Infrastructure Program Executive Officer Pete Lynch stated. The program will revamp four public shipyards to serve current and future classes of submarines and carriers. Work for the contract will be conducted as part of the Shipyard Infrastructure Optimization Program to bolster shipyard infrastructure dedicated to nuclear-powered warships. Shipyard Infrastructure Optimization Program The five-year agreement will see the development of a new graving dock (Dry Dock 5) to replace Dry Dock 3, sustaining PHNSY & IMF capabilities that modernize and maintain the US Pacific Fleet’s nuclear-powered submarines. The US Navy has awarded a joint venture of Dragados, Hawaiian Dredging, and Orion a $2.8-billion contract to construct a concrete dry dock at Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility ( PHNSY & IMF) in Oahu, Hawaii.
0 Comments
Leave a Reply.AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |